Xcel completes NM-TX power link

Xcel Energy has announced the completion of a transmission line across the state line.

The line spans 37 miles from the Curry County substation east of Clovis to the Bailey County substation south of Muleshoe.

Xcel says a study shows a need for a stronger transmission link in the area because of power demand and grid reliability.